💥 Gate Square Event: #PTB Creative Contest# 💥
Post original content related to PTB, CandyDrop #77, or Launchpool on Gate Square for a chance to share 5,000 PTB rewards!
CandyDrop x PTB 👉 https://www.gate.com/zh/announcements/article/46922
PTB Launchpool is live 👉 https://www.gate.com/zh/announcements/article/46934
📅 Event Period: Sep 10, 2025 04:00 UTC – Sep 14, 2025 16:00 UTC
📌 How to Participate:
Post original content related to PTB, CandyDrop, or Launchpool
Minimum 80 words
Add hashtag: #PTB Creative Contest#
Include CandyDrop or Launchpool participation screenshot
🏆 Rewards:
🥇 1st
The rooftop distributed photovoltaic project (Phase I) of Lansi Technology Huanghuayuan District is connected to the grid for power generation.
Jinshi data news on August 6th, Lansitech announced that on August 5th, Lansitech held a grid-connected and production ceremony for the full capacity of the photovoltaic power generation project in the Huanghuayuan area, marking the grid-connected power generation of the distributed photovoltaic project (Phase I) of Lansitech Huanghuayuan area. As an important part of Lansitech's 128.2MW distributed photovoltaic project, the total installed capacity of the rooftop distributed photovoltaic project in the Huanghuayuan area is about 20MW, with a high installed capacity of 16.17MW realized in the first phase.